2 )Before switching on the machine you must make a short inspection of the machine and its surroundings .
3 ) _ Loose cable connections and noticeable mechanical damage ?
_ Checked oil level in oil level viewing glass ?
_ Removed obstacles in machine area ; machine freely accessible from
all sides ?
_ Reaching into mould blocked from all sides ? ( visual check - reaching in from underneath and check peripheral equipment ) .
_ Are limit switches on safety devices functioning ?
_ Contact bank on safety gate functioning properly ?
_ Limit stops and guides of safety door functioning properly ?
_ Heating adjusted to the material being processed ?
_ Is discharge chute secured against reaching in ?
_ Squash and cutting place on plasticizing unit secured ?
_ Injection moulding machine free from oil , air and water leakages ?
_ Work place free from causes for tripping , granules and other contaminants ?
4 ) WARNING !
5 ) _ If necessary remove oil spots on the floor around the machine .
_ If necessary remove spilled plastic granules from the floor .